During the coming days and weeks, the existing political groups in the European Parliament and various national parties with elected members of the EP negotiate to form the political groups, which are central to parliamentary work.
As always, knowledge of the rules is a key element for an appreciation of the game, is sports as well as in politics.
The European Parliament has amended its Rules of Procedure, with changes taking place from the beginning of the new parliamentary term (version: 7th parliamentary term, July 2009).
Here are the provisions on the political groups in the European Parliament for the new parliament:
POLITICAL GROUPS
Rule 30
Formation of political groups
1. Members may form themselves into groups according to their political affinities.
[Interpretation: Parliament need not normally evaluate the political affinity of members of a group. In forming a group together under this Rule, Members concerned accept by definition that they have political affinity. Only when this is denied by the Members concerned is it necessary for Parliament to evaluate whether the group has been constituted in conformity with the Rules.]
2. A political group shall comprise Members elected in at least one-quarter of the Member States. The minimum number of Members required to form a political group shall be twenty-five.
3. Where a group falls below the required threshold, the President, with the agreement of the Conference of Presidents, may allow it to continue to exist until Parliament's next constitutive sitting, provided the following conditions are met:
- the members continue to represent at least one-fifth of the Member States;
- the group has been in existence for a period longer than one year.
The President shall not apply this derogation where there is sufficient evidence to suspect that it is being abused.
4. A Member may not belong to more than one political group.
5. The President shall be notified in a statement when a political group is set up. This statement shall specify the name of the group, its members and its bureau.
6. The statement shall be published in the Official Journal of the European Union.
Rule 31
Activities and legal situation of the political groups
1. The political groups shall carry out their duties as part of the activities of the Union, including the tasks allocated to them by the Rules of Procedure. The political groups shall be provided with a secretariat on the basis of the establishment plan of the Secretariat, administrative facilities and the appropriations entered for that purpose in Parliament's budget.
2. The Bureau shall lay down the rules relating to the provision, implementation and monitoring of those facilities and appropriations, as well as to the related delegations of budget implementation powers.
3. Those rules shall determine the administrative and financial consequences in the event of the dissolution of a political group.
Rule 32
Intergroups
1. Individual Members may form Intergroups or other unofficial groupings of Members, to hold informal exchanges of views on specific issues across different political groups, drawing on members of different parliamentary committees, and to promote contact between Members and civil society.
2. Such groupings may not engage in any activities which might result in confusion with the official activities of Parliament or of its bodies. Provided that the conditions laid down in rules governing their establishment adopted by the Bureau are respected, political groups may facilitate their activities by providing them with logistical support. Such groupings shall declare any external support in accordance with Annex I.
Rule 33
Non-attached Members
1. Members who do not belong to a political group shall be provided with a secretariat. The detailed arrangements shall be laid down by the Bureau on a proposal from the Secretary-General.
2. The Bureau shall also determine the status and parliamentary rights of such Members.
3. The Bureau shall also lay down the rules relating to the provision, implementation and auditing of appropriations entered in Parliament's budget to cover secretarial expenses and administrative facilities of non-attached Members.
Rule 34
Allocation of seats in the Chamber
The Conference of Presidents shall decide how seats in the Chamber are to be allocated among the political groups, the non-attached Members and the institutions of the European Union.
***
The significant thresholds for political groups have changed to at least 25 MEPs, elected in at least one-quarter of the member states (now 7).
The MEPs who fail to form or to join a political group, or who decide to stay on the sidelines, are called non-attached members (NI = non-inscrits).
Ralf Grahn
Showing posts with label threshold. Show all posts
Showing posts with label threshold. Show all posts
Saturday, 13 June 2009
Saturday, 28 February 2009
European Parliament: Forming and maintaining a political group
How hard should it be to acquire the privileges accorded to political groups in the European Parliament?
What happens if members of a small group threaten to leave?
***
Affinities
Even if the Europarties and the EP political groups are mainly coalitions, the Rules of Procedure require ‘political affinities’, which means that members are prevented from banding together on purely technical grounds to gain influence; Rule 29(1).
The Rules of Procedure add the following official explanation: Parliament need not normally evaluate the political affinity of members of a group. In forming a group together under this Rule, Members concerned accept by definition that they have political affinity. Only when this is denied by the Members concerned is it necessary for Parliament to evaluate whether the group has been constituted in conformity with the Rules.
***
Minimum requirements
The following hurdle is that a political group must have members from at least one fifth of the member states (now six) and a minimum membership of twenty MEPs: Rule 29(2).
CHAPTER 4 POLITICAL GROUPS
Rule 29 Formation of political groups
1. Members may form themselves into groups according to their political affinities.
2. A political group shall comprise Members elected in at least one-fifth of the Member States. The minimum number of Members required to form a political group shall be twenty.
3. A Member may not belong to more than one political group.
4. The President shall be notified in a statement when a political group is set up. This statement shall specify the name of the group, its members and its bureau.
5. The statement shall be published in the Official Journal of the European
Union.
***
Higher hurdle after European elections 2009
When the newly elected European Parliament convenes after the June 2009 elections, the requirements for forming a political group are going to be higher, according to the Decision on amendment of Rule 29 of Parliament’s Rules of Procedure ─ Formation of political groups; Resolution P6_TA-PROV(2008)0351.
As voted by the EPP and the PES, MEPs from at least a quarter of the member states will be needed; seven instead of six. The minimum number of MEPs rises from twenty to twenty-five.
Officially the European Parliament has aligned the number of member states with the number of states mentioned with regard to political parties at European level and their funding, but for Europarties it is enough to have elected representatives at national level in seven member states.
The committee report also compared the percentages of total membership needed in national parliaments to form political groups.
In fact it will be harder for motley crews of MEPs to the right of the centre-right (EPP) and to the left of the centre-left (PES) to find enough soul-mates to form political groups after the European elections.
The new Rule 29(2) sets the following requirements:
2. A political group shall comprise Members elected in at least one-quarter of the Member States. The minimum number of Members required to form a political group shall be twenty-five.
***
Transitional rule
If a duly constituted group slips under one of the thresholds or both, it can provisionally continue to exist on certain conditions according to the new Article 29(2a):
2a. Where a group falls below the required threshold, the President, with the agreement of the Conference of Presidents, may allow it to continue to exist until Parliament’s next constitutive sitting, provided the following conditions are met:
- the members continue to represent at least one-fifth of the Member States;
- the group has been in existence for a period longer than one year.
The President shall not apply this derogation where there is sufficient evidence to suspect that it is being abused.
***
Are these changes needed for the orderly conduct of business, or were the largest groups out to make life hard for potential secessionists?
Ralf Grahn
What happens if members of a small group threaten to leave?
***
Affinities
Even if the Europarties and the EP political groups are mainly coalitions, the Rules of Procedure require ‘political affinities’, which means that members are prevented from banding together on purely technical grounds to gain influence; Rule 29(1).
The Rules of Procedure add the following official explanation: Parliament need not normally evaluate the political affinity of members of a group. In forming a group together under this Rule, Members concerned accept by definition that they have political affinity. Only when this is denied by the Members concerned is it necessary for Parliament to evaluate whether the group has been constituted in conformity with the Rules.
***
Minimum requirements
The following hurdle is that a political group must have members from at least one fifth of the member states (now six) and a minimum membership of twenty MEPs: Rule 29(2).
CHAPTER 4 POLITICAL GROUPS
Rule 29 Formation of political groups
1. Members may form themselves into groups according to their political affinities.
2. A political group shall comprise Members elected in at least one-fifth of the Member States. The minimum number of Members required to form a political group shall be twenty.
3. A Member may not belong to more than one political group.
4. The President shall be notified in a statement when a political group is set up. This statement shall specify the name of the group, its members and its bureau.
5. The statement shall be published in the Official Journal of the European
Union.
***
Higher hurdle after European elections 2009
When the newly elected European Parliament convenes after the June 2009 elections, the requirements for forming a political group are going to be higher, according to the Decision on amendment of Rule 29 of Parliament’s Rules of Procedure ─ Formation of political groups; Resolution P6_TA-PROV(2008)0351.
As voted by the EPP and the PES, MEPs from at least a quarter of the member states will be needed; seven instead of six. The minimum number of MEPs rises from twenty to twenty-five.
Officially the European Parliament has aligned the number of member states with the number of states mentioned with regard to political parties at European level and their funding, but for Europarties it is enough to have elected representatives at national level in seven member states.
The committee report also compared the percentages of total membership needed in national parliaments to form political groups.
In fact it will be harder for motley crews of MEPs to the right of the centre-right (EPP) and to the left of the centre-left (PES) to find enough soul-mates to form political groups after the European elections.
The new Rule 29(2) sets the following requirements:
2. A political group shall comprise Members elected in at least one-quarter of the Member States. The minimum number of Members required to form a political group shall be twenty-five.
***
Transitional rule
If a duly constituted group slips under one of the thresholds or both, it can provisionally continue to exist on certain conditions according to the new Article 29(2a):
2a. Where a group falls below the required threshold, the President, with the agreement of the Conference of Presidents, may allow it to continue to exist until Parliament’s next constitutive sitting, provided the following conditions are met:
- the members continue to represent at least one-fifth of the Member States;
- the group has been in existence for a period longer than one year.
The President shall not apply this derogation where there is sufficient evidence to suspect that it is being abused.
***
Are these changes needed for the orderly conduct of business, or were the largest groups out to make life hard for potential secessionists?
Ralf Grahn
Wednesday, 25 February 2009
European Central Bank: Procurement amendments
The European Central Bank has aligned its procurement rules with the Procurement Directive 2004/18/EC.
The ECB is going to use the amended EU thresholds, establish lists of suitable suppliers for contracts below the thresholds and exclude bidders guilty of criminal acts or having conflicting interests.
The Decision of the European Central Bank ECB/2009/2 of 27 January 2009 amending Decision ECB/2007/5 laying down the Rules on Procurement has been officially published in the Official Journal of the European Union (OJEU) 24.2.2009 L 51/10. The Decision enters into force on 1 March 2009.
The original Decision ECB/2007/5 of 3 July 2007 was published in the OJEU 14.7.2007 L 184/34.
Ralf Grahn
The ECB is going to use the amended EU thresholds, establish lists of suitable suppliers for contracts below the thresholds and exclude bidders guilty of criminal acts or having conflicting interests.
The Decision of the European Central Bank ECB/2009/2 of 27 January 2009 amending Decision ECB/2007/5 laying down the Rules on Procurement has been officially published in the Official Journal of the European Union (OJEU) 24.2.2009 L 51/10. The Decision enters into force on 1 March 2009.
The original Decision ECB/2007/5 of 3 July 2007 was published in the OJEU 14.7.2007 L 184/34.
Ralf Grahn
Labels:
amendment,
ECB,
EU Law,
European Central Bank,
European Union,
exclusion,
procurement,
supplier,
threshold
Monday, 16 February 2009
EU services procurement: Mixed contracts
Earlier we looked at the procurement of priority services (Annex II A) and at non-priority services (Annex II B). What to do when the same public contract covers both?
These contracts are defined as mixed.
The Procurement Directive 2004/18/EC offers a simple rule, based on the value of the different services. If the value of the priority services is greater, the full procurement procedures apply.
If not, only the provisions concerning non-priority services have to be observed.
***
Article 22 Mixed contracts
Article 22 of the Procurement Directive 2004/18/EC, or the Classic Directive, lays down the rules concerning mixed contracts based on the value of priority and non-priority services:
Article 22
Mixed contracts including services listed in Annex II A and services listed in Annex II B
Contracts which have as their object services listed both in Annex II A and in Annex II B shall be awarded in accordance with Articles 23 to 55 where the value of the services listed in Annex II A is greater than the value of the services listed in Annex II B. In other cases, contracts shall be awarded in accordance with Article 23 and Article 35(4).
***
UK reminder: Under single contract
In the United Kingdom the EU Procurement Directive was transposed through the Public Contracts Regulations 2006 (No. 5). For the sake of the clarifying words ‘under a single contract’ the text of Section 2(3), under Crown copyright, is reproduced here:
(3) Where services specified in both Parts A and B of Schedule 3 are to be provided under a single contract, then the contract shall be treated as—
(a) a Part A services contract if the value of the consideration attributable to the services specified in Part A is greater than that attributable to those specified in Part B; and
(b) a Part B services contract if the value of the consideration attributable to the services specified in Part B is equal to or greater than that attributable to those specified in Part A.
***
Reminder: EU threshold
The Finnish Act on Public Contracts (348/2007) is another example of national transposing legislation. Here the latter part of Section 21(1) reminds us that the EU contract values (thresholds) determine if the procurement procedures apply to a certain contract:
Chapter 4 — Application rules for various contract types
Section 21 — Application rules for public supply and service contracts, service concessions and public works contracts
(1) The provisions laid out in this Act shall be applied to public supply contracts, public service contracts referred to in Annex A and to works contracts above the EU threshold, as referred to in Section 16, subsection 1, paragraphs 1 or 2, with the exception of the provisions laid down in Chapter 9. The provisions of this Act shall be applied to the cases in which services referred to in Annex A are purchased together with services referred to in Annex B, insofar as the value of the services referred to in Annex A is greater than the value of the services referred to in Annex B and the total value of such a service contract exceeds the value of the EU threshold.
***
Don’t get mixed up
Article 22 concerns mixed services contracts, including both priority and non-priority services. The contract should form a logical whole, without artificial bundling of unrelated non-priority services to avoid the rigours of the full tendering procedure.
But the term mixed contracts is used for other mixtures as well. Different components of services, works and supplies are possible and they follow their own rules. Just as an example of other mixes, here is an excerpt from the Office of Government Commerce (OGC) EU procurement guidance: Introduction to the EU procurement rules (March 2008; page 5):
8. Mixed contracts
Although the public sector Regulations have been consolidated, some differences in treatment remain for supplies, services and works contracts. Usually it will be clear how to categorise a requirement from its subject matter but there are occasions when contracts contain elements of both supplies and services, for example. In those cases:
• Where a contract covers both services and supplies, the classification should be determined by the respective values of the two elements.
• Where it covers works/supplies or works/services, it should be classified according to its predominant purpose.
• Where a contract provides for the supply of equipment and an operator it should be regarded as a services contract.
• Contracts for software are considered to be for supplies unless they have to be tailored to the purchaser’s specification, in which case they are services.
***
If priority services constitute the greater part a mixed public services contract reaching the EU threshold, without artificial devices, the procurement procedures apply in full.
Ralf Grahn
These contracts are defined as mixed.
The Procurement Directive 2004/18/EC offers a simple rule, based on the value of the different services. If the value of the priority services is greater, the full procurement procedures apply.
If not, only the provisions concerning non-priority services have to be observed.
***
Article 22 Mixed contracts
Article 22 of the Procurement Directive 2004/18/EC, or the Classic Directive, lays down the rules concerning mixed contracts based on the value of priority and non-priority services:
Article 22
Mixed contracts including services listed in Annex II A and services listed in Annex II B
Contracts which have as their object services listed both in Annex II A and in Annex II B shall be awarded in accordance with Articles 23 to 55 where the value of the services listed in Annex II A is greater than the value of the services listed in Annex II B. In other cases, contracts shall be awarded in accordance with Article 23 and Article 35(4).
***
UK reminder: Under single contract
In the United Kingdom the EU Procurement Directive was transposed through the Public Contracts Regulations 2006 (No. 5). For the sake of the clarifying words ‘under a single contract’ the text of Section 2(3), under Crown copyright, is reproduced here:
(3) Where services specified in both Parts A and B of Schedule 3 are to be provided under a single contract, then the contract shall be treated as—
(a) a Part A services contract if the value of the consideration attributable to the services specified in Part A is greater than that attributable to those specified in Part B; and
(b) a Part B services contract if the value of the consideration attributable to the services specified in Part B is equal to or greater than that attributable to those specified in Part A.
***
Reminder: EU threshold
The Finnish Act on Public Contracts (348/2007) is another example of national transposing legislation. Here the latter part of Section 21(1) reminds us that the EU contract values (thresholds) determine if the procurement procedures apply to a certain contract:
Chapter 4 — Application rules for various contract types
Section 21 — Application rules for public supply and service contracts, service concessions and public works contracts
(1) The provisions laid out in this Act shall be applied to public supply contracts, public service contracts referred to in Annex A and to works contracts above the EU threshold, as referred to in Section 16, subsection 1, paragraphs 1 or 2, with the exception of the provisions laid down in Chapter 9. The provisions of this Act shall be applied to the cases in which services referred to in Annex A are purchased together with services referred to in Annex B, insofar as the value of the services referred to in Annex A is greater than the value of the services referred to in Annex B and the total value of such a service contract exceeds the value of the EU threshold.
***
Don’t get mixed up
Article 22 concerns mixed services contracts, including both priority and non-priority services. The contract should form a logical whole, without artificial bundling of unrelated non-priority services to avoid the rigours of the full tendering procedure.
But the term mixed contracts is used for other mixtures as well. Different components of services, works and supplies are possible and they follow their own rules. Just as an example of other mixes, here is an excerpt from the Office of Government Commerce (OGC) EU procurement guidance: Introduction to the EU procurement rules (March 2008; page 5):
8. Mixed contracts
Although the public sector Regulations have been consolidated, some differences in treatment remain for supplies, services and works contracts. Usually it will be clear how to categorise a requirement from its subject matter but there are occasions when contracts contain elements of both supplies and services, for example. In those cases:
• Where a contract covers both services and supplies, the classification should be determined by the respective values of the two elements.
• Where it covers works/supplies or works/services, it should be classified according to its predominant purpose.
• Where a contract provides for the supply of equipment and an operator it should be regarded as a services contract.
• Contracts for software are considered to be for supplies unless they have to be tailored to the purchaser’s specification, in which case they are services.
***
If priority services constitute the greater part a mixed public services contract reaching the EU threshold, without artificial devices, the procurement procedures apply in full.
Ralf Grahn
Wednesday, 28 January 2009
Tender notices 2008 in Finland
Last year 19,713 tender notices were published in Finland for a total value of 14 billion euros. Even if the notices for the largest public contracts, above the EU thresholds, are published on TED (Tenders Electronic Daily), national tenders are not unimportant on the Finnish procurement market.
These are contracts below the EU thresholds, but above the national ones laid down in the Act on public contracts. In 2008 the number of national notices was 13,988, for a total value of 6 billion euros.
Source: HILMA – Julkiset hankinnat: HILMAssa julkaistut hankintailmoitukset 1.1.2008 – 31.12.2008 (Statistics 12 January 2009)
www.hankintailmoitukset.fi
Ralf Grahn
These are contracts below the EU thresholds, but above the national ones laid down in the Act on public contracts. In 2008 the number of national notices was 13,988, for a total value of 6 billion euros.
Source: HILMA – Julkiset hankinnat: HILMAssa julkaistut hankintailmoitukset 1.1.2008 – 31.12.2008 (Statistics 12 January 2009)
www.hankintailmoitukset.fi
Ralf Grahn
Labels:
Finland,
HILMA,
procurement,
public contract,
TED,
tender notice,
threshold,
value
Procurement Finland: National thresholds
The Finnish Act on Public Contracts (348/2007) transposed the EC (EU) Procurement Directive 2004/18/EC into national law. The official texts are in Finnish and Swedish, but an unofficial English translation is available at:
http://www.finlex.fi/en/laki/kaannokset/2007/en20070348.pdf
The Act on Public Contracts entered into force on 1 June 2007.
***
National thresholds
The Act applies to procurement procedures well below the European Community thresholds through national thresholds. National publication requirements apply to contracts above the following values:
National thresholds (Section 15 of the Act on public contracts), in euros
Supply and service contracts 15 000
Concessions 15 000
Annex B (Group 25) joint procurement for health care, social services and education
50 000
Public works contracts 100 000
Concessions 100 000
Design contests 15 000
Source: Ministry of Employment and the Economy (Finland)
Ralf Grahn
http://www.finlex.fi/en/laki/kaannokset/2007/en20070348.pdf
The Act on Public Contracts entered into force on 1 June 2007.
***
National thresholds
The Act applies to procurement procedures well below the European Community thresholds through national thresholds. National publication requirements apply to contracts above the following values:
National thresholds (Section 15 of the Act on public contracts), in euros
Supply and service contracts 15 000
Concessions 15 000
Annex B (Group 25) joint procurement for health care, social services and education
50 000
Public works contracts 100 000
Concessions 100 000
Design contests 15 000
Source: Ministry of Employment and the Economy (Finland)
Ralf Grahn
Friday, 2 January 2009
EU procurement: Calculating contract value
It is necessary to estimate the contract value before the start of the procurement process.
The detailed provisions of the Procurement Directive apply to public contracts above certain thresholds. These bigger contracts are considered to be the ones most important for the functioning of the internal market.
Rules are therefore needed to define the total (aggregate) value of contracts as a whole or over time. One aim is to prevent the artificial splitting of contracts in order to evade the application of the Procurement Directive.
In addition, only certain elements of contract values can be calculated, while others have to be estimated. The ‘correct’ answer cannot be known with certainty in advance, so the Procurement Directive offers the contracting authorities certain general rules. Different kinds of public contracts need individual basic rules of presumption to arrive at harmonised procedures in the EU member states.
***
Article 9
The EC (EU) Procurement Directive 2004/18/EC presents the rules for calculating the values of different types of public contracts:
Article 9
Methods for calculating the estimated value of public contracts, framework agreements and dynamic purchasing systems
1. The calculation of the estimated value of a public contract shall be based on the total amount payable, net of VAT, as estimated by the contracting authority. This calculation shall take account of the estimated total amount, including any form of option and any renewals of the contract.
Where the contracting authority provides for prizes or payments to candidates or tenderers it shall take them into account when calculating the estimated value of the contract.
2. This estimate must be valid at the moment at which the contract notice is sent, as provided for in Article 35(2), or, in cases where such notice is not required, at the moment at which the contracting authority commences the contract awarding procedure.
3. No works project or proposed purchase of a certain quantity of supplies and/or services may be subdivided to prevent its coming within the scope of this Directive.
4. With regard to public works contracts, calculation of the estimated value shall take account of both the cost of the works and the total estimated value of the supplies necessary for executing the works and placed at the contractor's disposal by the contracting authorities.
5. (a) Where a proposed work or purchase of services may result in contracts being awarded at the same time in the form of separate lots, account shall be taken of the total estimated value of all such lots.
Where the aggregate value of the lots is equal to or exceeds the threshold laid down in Article 7, this Directive shall apply to the awarding of each lot.
However, the contracting authorities may waive such application in respect of lots the estimated value of which net of VAT is less than EUR 80 000 for services or EUR 1 million for works, provided that the aggregate value of those lots does not exceed 20 % of the aggregate value of the lots as a whole.
(b) Where a proposal for the acquisition of similar supplies may result in contracts being awarded at the same time in the form of separate lots, account shall be taken of the total estimated value of all such lots when applying Article 7(a) and (b).
Where the aggregate value of the lots is equal to or exceeds the threshold laid down in Article 7, this Directive shall apply to the awarding of each lot.
However, the contracting authorities may waive such application in respect of lots, the estimated value of which, net of VAT, is less than EUR 80 000, provided that the aggregate cost of those lots does not exceed 20 % of the aggregate value of the lots as a whole.
6. With regard to public supply contracts relating to the leasing, hire, rental or hire purchase of products, the value to be taken as a basis for calculating the estimated contract value shall be as follows:
(a) in the case of fixed-term public contracts, if that term is less than or equal to 12 months, the total estimated value for the term of the contract or, if the term of the contract is greater than 12 months, the total value including the estimated residual value;
(b) in the case of public contracts without a fixed term or the term of which cannot be defined, the monthly value multiplied by 48.
7. In the case of public supply or service contracts which are regular in nature or which are intended to be renewed within a given period, the calculation of the estimated contract value shall be based on the following:
(a) either the total actual value of the successive contracts of the same type awarded during the preceding 12 months or financial year adjusted, if possible, to take account of the changes in quantity or value which would occur in the course of the 12 months following the initial contract;
(b) or the total estimated value of the successive contracts awarded during the 12 months following the first delivery, or during the financial year if that is longer than 12 months.
The choice of method used to calculate the estimated value of a public contract may not be made with the intention of excluding it from the scope of this Directive.
8. With regard to public service contracts, the value to be taken as a basis for calculating the estimated contract value shall, where appropriate, be the following:
(a) for the following types of services:
(i) insurance services: the premium payable and other forms of remuneration;
(ii) banking and other financial services: the fees, commissions, interest and other forms of remuneration;
(iii) design contracts: fees, commission payable and other forms of remuneration;
(b) for service contracts which do not indicate a total price:
(i) in the case of fixed-term contracts, if that term is less than or equal to 48 months: the total value for their full term;
(ii) in the case of contracts without a fixed term or with a term greater than 48 months: the monthly value multiplied by 48.
9. With regard to framework agreements and dynamic purchasing systems, the value to be taken into consideration shall be the maximum estimated value net of VAT of all the contracts envisaged for the total term of the framework agreement or the dynamic purchasing system.
***
Estimating works contracts
The Commission’s Guide to the Community rules on public works contracts is based on the old Directive 93/37/EEC, so the monetary values mentioned are obsolete, but the principles are worth reading (page 16 to 17):
2.2 Estimation of contract value
2.2.1 Rules
In general terms, the value to be taken into account in determining whether a public works contract reaches the threshold is the estimated value excluding VAT of the contract which the contracting authority intends to award. The estimation should therefore include all the services, materials, etc. to be covered by the contract. For example, where a contracting authority chooses to award a development contract, the estimated contract value should include not only activities covered by Class 50 of the NACE nomenclature, but also all other tasks to be entrusted to the contractor under that contract.
Alongside the above general rule, which flows from the way in which public works contracts are defined, the Directive lays down rules for estimating the contract value in three specific cases.
Where the contracting authority itself makes available to the contractor supplies needed to carry out the works, the contract value must include the estimated value of those supplies as well as the value of the works.
Supplies should be understood here as referring not only to materials to be incorporated in the building or structure, but also to the plant or equipment necessary for the works: a contracting authority could, for example, provide the contractor with a crane or lorries. In the case of plant and equipment, the value to be taken into account will of course not always be the purchase price, but instead the price normally charged on the market for hiring it. Which of the two prices is taken into account will depend on the average life of the equipment and the length of time it is made available by the contracting authority: if an item of equipment is designed to have a useful life that is longer than the time it is made available (for example, the equipment is made to last for five years and the contractor can use it for one year), the value to be taken into account will be the hire price. If, on the other hand, the equipment is made available for longer than its average life, the contracting authority will have to include its purchase price in the estimate of the contract value.
Where a work is subdivided into several lots, each one the subject of a contract, the aggregate value of all the lots must be taken into account in determining whether or not the threshold has been reached. If that is the case, the Directive is to be applied to the award of each contract, irrespective of the value of the lot to which it relates. Nevertheless, contracting authorities are allowed to award freely lots whose estimated value excluding VAT is less than ECU 1 million. Permission to depart from the Directive is, however, limited: the aggregate value of lots awarded freely may not exceed 20% of the total estimated value of all lots.
Let us take an example: a contract for building works is divided into three lots, estimated at ECU 3 million, ECU 1 200 000 and ECU 900 000. The aggregate estimated value is therefore ECU 5 100 000, which clearly exceeds the threshold for application of the Directive. However, the derogation may be used for the lot estimated at ECU 900 000, since its individual value is less than ECU 1 million and does not exceed 20% of the total value of all the lots. The Directive does not apply to this lot, which need not be advertised, but it does apply to the other two.
Where a contracting authority intends “subsequently” to award, by negotiated procedure, further works consisting of the repetition of similar works to the successful tenderer for the contract that is being put up for tender, it must include in the calculation of the value of the first contract the estimated total cost of the subsequent works and, where appropriate, the estimated value of all the necessary supplies that it will make available to the contractor.
2.2.2 Splitting of contracts
Lastly, no work or contract may be split up with a view to avoiding application of the Directive. This blanket prohibition catches any splitting which is not justified on objective grounds and is thus solely designed to circumvent the rules laid down in the Directive.
***
Estimating supply contracts
The Commission’s Guide to the Community rules on public supply contracts (based on the old Directive 93/36/EEC) explains how to estimate the value of supply contracts (page 14 to 15):
2.2 Estimation of contract value
2.2.1 Methods
In establishing whether or not the relevant threshold is reached, the way in which the value of a contract is calculated is obviously crucial. To ensure that identical calculation methods are used throughout the Community and to prevent evasion of the procurement rules by artificially low valuations, the Directive lays down specific rules.
Where the contract is to be concluded in the form of a lease, rental or hire–purchase agreement, the calculation method varies according to the contract’s duration.
The estimated value is to be calculated on the basis of:
where its term is 12 months or less, the total value for the contract’s duration;
where its term exceeds 12 months, the total value for the contract’s duration, including the estimated residual value of the products;
where the contract is concluded for an indefinite period or where its term cannot be defined, the monthly value multiplied by 48.
Where contracts are of a regular nature or are to be renewed over a given period, the following must be taken into account:
either the actual aggregate value of similar successive contracts awarded over the previous 12 months or accounting period, adjusted where possible for anticipated changes in quantity or value over the subsequent 12 months;
or the estimated aggregate value of the successive contracts concluded during the 12 months following the initial delivery or accounting period, where this exceeds 12 months.
In any event, the choice between these two valuation methods must not be made with the intention of keeping contracts outside the scope of the Directive.
If a proposed procurement of supplies of the same type may lead to contracts being awarded at the same time in separate lots, the estimated value of all the lots must be taken into account. If it reaches the relevant threshold, all the lots must be awarded in compliance with the Directive. The same rules apply when estimating the value of leasing, rental or hire–purchase contracts.
“Supplies of the same type” are to be understood as products which are intended for identical or similar uses, e.g. supplies of a range of foods or of different items of office furniture.
Where provision is explicitly made for options, the basis for calculating the estimated contract value must be the highest possible total permitted for the purchase, lease, rental or hire purchase, options included.
2.2.2 Time of estimation
The value of the supplies which it is wanted to procure may vary depending on a number of factors. The time at which the value is estimated, therefore, may turn out to be crucial to determining whether the contract attains the threshold laid down in the Directive.
Accordingly, contracting authorities are obliged, regardless of any earlier estimate of the contract, to take account of the value which the supplies that are the subject of the contract will have when the award procedure is initiated by the dispatch of the notice for publication or by an invitation to negotiate.
2.2.3 Splitting of contracts
There is a blanket prohibition on the splitting of a procurement requirement with the intention of circumventing the rules on estimating the contract value and, more widely, on applying the Directive as a whole.
For example, where a contracting authority comprises several departments that are not decentralized from an administrative viewpoint and, consequently, cannot be regarded as contracting authorities in their own right with the power to award public supply contracts within the meaning of the Directive, it must take into account all the requirements of its constituent departments when estimating the value of a contract.
***
Estimating service contracts
The Commission’s Guide to the Community rules on public procurement of services (based on the old Directive 92/50/EEC) offers the following guidance on estimating values of service contracts (page 15 to 17):
2.2 Calculation of the contract value
2.2.1 Methods
The general rule is that the contracting authority must take into account the estimated total remuneration for the service net of VAT. For certain types of service contracts, the Services Directive specifies certain items which constitute remuneration, notably:
- the premium payable, in the case of insurance services;
- fees, commissions and interest, in the case of banking and other financial services;
- fees or commissions, in the case of design contracts.
The Commission considers this list to be illustrative and does not limit, in any way, the general principle that the total remuneration received must be taken into account.
In the case of contracts which do not specify a total price, the basis for calculating the estimated contract value is:
- in the case of fixed-term contracts, where their term is 48 months or less, the total contract value for its duration;
- in the case of contracts of indefinite duration or with a term of more than 48 months, the monthly instalment multiplied by 48.
In the case of regular contracts or of contracts which are to be renewed within a given time, the contract value may be established on the basis of:
- either the actual aggregate cost of similar contracts for the same categories of services awarded over the previous fiscal year of twelve months, adjusted, where possible, for anticipated changes in quantity or value over the twelve months following the initial contract,
- or the estimated aggregate cost during the twelve months following the first service performed or during the term of the contract, where this is greater than twelve months.
Where a proposed contract provides for options, the basis for calculating the contract value shall be the maximum total possible assuming that all the options will be exercised.
In any event, selection of the valuation method may not be made with the intention of avoiding the application of the Services Directive.
2.2.2 Split contracts
The Services Directive prohibits any division of services with the intention of avoiding application of the value thresholds. This prohibition is directed at any division of a contract which is not justified by objective considerations and so is presumed to be designed to avoid application of the Directive.
2.2.3 Division of the contract into lots
Where the services are divided into several lots, each one the subject of a contract, the cumulative value of all the lots must be taken into account in determining whether the ECU 200,000 threshold has been reached. If the threshold is reached, the Services Directive must be applied to each contract, irrespective of the fact that its individual value may be less than ECU 200,000.
A contracting authority need not apply the provisions of the Services Directive to any lots which have an estimated individual value net of VAT of less than ECU 80,000, provided that the total value of such lots does not exceed 20% of the total value of all the lots. Exclusion of lots in this way does not prevent their value from being taken into account to determine whether the other lots must be awarded in accordance with the Services Directive.
Example:
A services contract for maintenance of buildings is divided into the following lots:
Lot 1 ECU 100,000
Lot 2 ECU 60,000
Lot 3 ECU 45,000
Lot 4 ECU 45,000
Total ECU 240,000
The cumulative value is ECU 240,000 so the value threshold for application of the Services Directive has clearly been reached. Each of the lots 2, 3 and 4 is less than ECU 80,000 but the derogation is permitted only up to 20% of the cumulative value, namely ECU 48,000. The contracting authority therefore has the option of excluding Lot 3 or Lot 4, but not both, from application of the Services Directive. The three lots not excluded must be awarded in accordance with the Directive because their total value including the excluded lot, is not less than ECU 200,000.
2.2.4 Intended repetition of similar services
It should be remembered that when a contracting authority intends to have recourse to the negotiated procedure without publication of a notice for the purposes of procuring new services as a repetition of similar services (see 3.3.2.6), it must aggregate the value of the original services and the intended subsequent services in determining whether the threshold has been achieved.
Ralf Grahn
The detailed provisions of the Procurement Directive apply to public contracts above certain thresholds. These bigger contracts are considered to be the ones most important for the functioning of the internal market.
Rules are therefore needed to define the total (aggregate) value of contracts as a whole or over time. One aim is to prevent the artificial splitting of contracts in order to evade the application of the Procurement Directive.
In addition, only certain elements of contract values can be calculated, while others have to be estimated. The ‘correct’ answer cannot be known with certainty in advance, so the Procurement Directive offers the contracting authorities certain general rules. Different kinds of public contracts need individual basic rules of presumption to arrive at harmonised procedures in the EU member states.
***
Article 9
The EC (EU) Procurement Directive 2004/18/EC presents the rules for calculating the values of different types of public contracts:
Article 9
Methods for calculating the estimated value of public contracts, framework agreements and dynamic purchasing systems
1. The calculation of the estimated value of a public contract shall be based on the total amount payable, net of VAT, as estimated by the contracting authority. This calculation shall take account of the estimated total amount, including any form of option and any renewals of the contract.
Where the contracting authority provides for prizes or payments to candidates or tenderers it shall take them into account when calculating the estimated value of the contract.
2. This estimate must be valid at the moment at which the contract notice is sent, as provided for in Article 35(2), or, in cases where such notice is not required, at the moment at which the contracting authority commences the contract awarding procedure.
3. No works project or proposed purchase of a certain quantity of supplies and/or services may be subdivided to prevent its coming within the scope of this Directive.
4. With regard to public works contracts, calculation of the estimated value shall take account of both the cost of the works and the total estimated value of the supplies necessary for executing the works and placed at the contractor's disposal by the contracting authorities.
5. (a) Where a proposed work or purchase of services may result in contracts being awarded at the same time in the form of separate lots, account shall be taken of the total estimated value of all such lots.
Where the aggregate value of the lots is equal to or exceeds the threshold laid down in Article 7, this Directive shall apply to the awarding of each lot.
However, the contracting authorities may waive such application in respect of lots the estimated value of which net of VAT is less than EUR 80 000 for services or EUR 1 million for works, provided that the aggregate value of those lots does not exceed 20 % of the aggregate value of the lots as a whole.
(b) Where a proposal for the acquisition of similar supplies may result in contracts being awarded at the same time in the form of separate lots, account shall be taken of the total estimated value of all such lots when applying Article 7(a) and (b).
Where the aggregate value of the lots is equal to or exceeds the threshold laid down in Article 7, this Directive shall apply to the awarding of each lot.
However, the contracting authorities may waive such application in respect of lots, the estimated value of which, net of VAT, is less than EUR 80 000, provided that the aggregate cost of those lots does not exceed 20 % of the aggregate value of the lots as a whole.
6. With regard to public supply contracts relating to the leasing, hire, rental or hire purchase of products, the value to be taken as a basis for calculating the estimated contract value shall be as follows:
(a) in the case of fixed-term public contracts, if that term is less than or equal to 12 months, the total estimated value for the term of the contract or, if the term of the contract is greater than 12 months, the total value including the estimated residual value;
(b) in the case of public contracts without a fixed term or the term of which cannot be defined, the monthly value multiplied by 48.
7. In the case of public supply or service contracts which are regular in nature or which are intended to be renewed within a given period, the calculation of the estimated contract value shall be based on the following:
(a) either the total actual value of the successive contracts of the same type awarded during the preceding 12 months or financial year adjusted, if possible, to take account of the changes in quantity or value which would occur in the course of the 12 months following the initial contract;
(b) or the total estimated value of the successive contracts awarded during the 12 months following the first delivery, or during the financial year if that is longer than 12 months.
The choice of method used to calculate the estimated value of a public contract may not be made with the intention of excluding it from the scope of this Directive.
8. With regard to public service contracts, the value to be taken as a basis for calculating the estimated contract value shall, where appropriate, be the following:
(a) for the following types of services:
(i) insurance services: the premium payable and other forms of remuneration;
(ii) banking and other financial services: the fees, commissions, interest and other forms of remuneration;
(iii) design contracts: fees, commission payable and other forms of remuneration;
(b) for service contracts which do not indicate a total price:
(i) in the case of fixed-term contracts, if that term is less than or equal to 48 months: the total value for their full term;
(ii) in the case of contracts without a fixed term or with a term greater than 48 months: the monthly value multiplied by 48.
9. With regard to framework agreements and dynamic purchasing systems, the value to be taken into consideration shall be the maximum estimated value net of VAT of all the contracts envisaged for the total term of the framework agreement or the dynamic purchasing system.
***
Estimating works contracts
The Commission’s Guide to the Community rules on public works contracts is based on the old Directive 93/37/EEC, so the monetary values mentioned are obsolete, but the principles are worth reading (page 16 to 17):
2.2 Estimation of contract value
2.2.1 Rules
In general terms, the value to be taken into account in determining whether a public works contract reaches the threshold is the estimated value excluding VAT of the contract which the contracting authority intends to award. The estimation should therefore include all the services, materials, etc. to be covered by the contract. For example, where a contracting authority chooses to award a development contract, the estimated contract value should include not only activities covered by Class 50 of the NACE nomenclature, but also all other tasks to be entrusted to the contractor under that contract.
Alongside the above general rule, which flows from the way in which public works contracts are defined, the Directive lays down rules for estimating the contract value in three specific cases.
Where the contracting authority itself makes available to the contractor supplies needed to carry out the works, the contract value must include the estimated value of those supplies as well as the value of the works.
Supplies should be understood here as referring not only to materials to be incorporated in the building or structure, but also to the plant or equipment necessary for the works: a contracting authority could, for example, provide the contractor with a crane or lorries. In the case of plant and equipment, the value to be taken into account will of course not always be the purchase price, but instead the price normally charged on the market for hiring it. Which of the two prices is taken into account will depend on the average life of the equipment and the length of time it is made available by the contracting authority: if an item of equipment is designed to have a useful life that is longer than the time it is made available (for example, the equipment is made to last for five years and the contractor can use it for one year), the value to be taken into account will be the hire price. If, on the other hand, the equipment is made available for longer than its average life, the contracting authority will have to include its purchase price in the estimate of the contract value.
Where a work is subdivided into several lots, each one the subject of a contract, the aggregate value of all the lots must be taken into account in determining whether or not the threshold has been reached. If that is the case, the Directive is to be applied to the award of each contract, irrespective of the value of the lot to which it relates. Nevertheless, contracting authorities are allowed to award freely lots whose estimated value excluding VAT is less than ECU 1 million. Permission to depart from the Directive is, however, limited: the aggregate value of lots awarded freely may not exceed 20% of the total estimated value of all lots.
Let us take an example: a contract for building works is divided into three lots, estimated at ECU 3 million, ECU 1 200 000 and ECU 900 000. The aggregate estimated value is therefore ECU 5 100 000, which clearly exceeds the threshold for application of the Directive. However, the derogation may be used for the lot estimated at ECU 900 000, since its individual value is less than ECU 1 million and does not exceed 20% of the total value of all the lots. The Directive does not apply to this lot, which need not be advertised, but it does apply to the other two.
Where a contracting authority intends “subsequently” to award, by negotiated procedure, further works consisting of the repetition of similar works to the successful tenderer for the contract that is being put up for tender, it must include in the calculation of the value of the first contract the estimated total cost of the subsequent works and, where appropriate, the estimated value of all the necessary supplies that it will make available to the contractor.
2.2.2 Splitting of contracts
Lastly, no work or contract may be split up with a view to avoiding application of the Directive. This blanket prohibition catches any splitting which is not justified on objective grounds and is thus solely designed to circumvent the rules laid down in the Directive.
***
Estimating supply contracts
The Commission’s Guide to the Community rules on public supply contracts (based on the old Directive 93/36/EEC) explains how to estimate the value of supply contracts (page 14 to 15):
2.2 Estimation of contract value
2.2.1 Methods
In establishing whether or not the relevant threshold is reached, the way in which the value of a contract is calculated is obviously crucial. To ensure that identical calculation methods are used throughout the Community and to prevent evasion of the procurement rules by artificially low valuations, the Directive lays down specific rules.
Where the contract is to be concluded in the form of a lease, rental or hire–purchase agreement, the calculation method varies according to the contract’s duration.
The estimated value is to be calculated on the basis of:
where its term is 12 months or less, the total value for the contract’s duration;
where its term exceeds 12 months, the total value for the contract’s duration, including the estimated residual value of the products;
where the contract is concluded for an indefinite period or where its term cannot be defined, the monthly value multiplied by 48.
Where contracts are of a regular nature or are to be renewed over a given period, the following must be taken into account:
either the actual aggregate value of similar successive contracts awarded over the previous 12 months or accounting period, adjusted where possible for anticipated changes in quantity or value over the subsequent 12 months;
or the estimated aggregate value of the successive contracts concluded during the 12 months following the initial delivery or accounting period, where this exceeds 12 months.
In any event, the choice between these two valuation methods must not be made with the intention of keeping contracts outside the scope of the Directive.
If a proposed procurement of supplies of the same type may lead to contracts being awarded at the same time in separate lots, the estimated value of all the lots must be taken into account. If it reaches the relevant threshold, all the lots must be awarded in compliance with the Directive. The same rules apply when estimating the value of leasing, rental or hire–purchase contracts.
“Supplies of the same type” are to be understood as products which are intended for identical or similar uses, e.g. supplies of a range of foods or of different items of office furniture.
Where provision is explicitly made for options, the basis for calculating the estimated contract value must be the highest possible total permitted for the purchase, lease, rental or hire purchase, options included.
2.2.2 Time of estimation
The value of the supplies which it is wanted to procure may vary depending on a number of factors. The time at which the value is estimated, therefore, may turn out to be crucial to determining whether the contract attains the threshold laid down in the Directive.
Accordingly, contracting authorities are obliged, regardless of any earlier estimate of the contract, to take account of the value which the supplies that are the subject of the contract will have when the award procedure is initiated by the dispatch of the notice for publication or by an invitation to negotiate.
2.2.3 Splitting of contracts
There is a blanket prohibition on the splitting of a procurement requirement with the intention of circumventing the rules on estimating the contract value and, more widely, on applying the Directive as a whole.
For example, where a contracting authority comprises several departments that are not decentralized from an administrative viewpoint and, consequently, cannot be regarded as contracting authorities in their own right with the power to award public supply contracts within the meaning of the Directive, it must take into account all the requirements of its constituent departments when estimating the value of a contract.
***
Estimating service contracts
The Commission’s Guide to the Community rules on public procurement of services (based on the old Directive 92/50/EEC) offers the following guidance on estimating values of service contracts (page 15 to 17):
2.2 Calculation of the contract value
2.2.1 Methods
The general rule is that the contracting authority must take into account the estimated total remuneration for the service net of VAT. For certain types of service contracts, the Services Directive specifies certain items which constitute remuneration, notably:
- the premium payable, in the case of insurance services;
- fees, commissions and interest, in the case of banking and other financial services;
- fees or commissions, in the case of design contracts.
The Commission considers this list to be illustrative and does not limit, in any way, the general principle that the total remuneration received must be taken into account.
In the case of contracts which do not specify a total price, the basis for calculating the estimated contract value is:
- in the case of fixed-term contracts, where their term is 48 months or less, the total contract value for its duration;
- in the case of contracts of indefinite duration or with a term of more than 48 months, the monthly instalment multiplied by 48.
In the case of regular contracts or of contracts which are to be renewed within a given time, the contract value may be established on the basis of:
- either the actual aggregate cost of similar contracts for the same categories of services awarded over the previous fiscal year of twelve months, adjusted, where possible, for anticipated changes in quantity or value over the twelve months following the initial contract,
- or the estimated aggregate cost during the twelve months following the first service performed or during the term of the contract, where this is greater than twelve months.
Where a proposed contract provides for options, the basis for calculating the contract value shall be the maximum total possible assuming that all the options will be exercised.
In any event, selection of the valuation method may not be made with the intention of avoiding the application of the Services Directive.
2.2.2 Split contracts
The Services Directive prohibits any division of services with the intention of avoiding application of the value thresholds. This prohibition is directed at any division of a contract which is not justified by objective considerations and so is presumed to be designed to avoid application of the Directive.
2.2.3 Division of the contract into lots
Where the services are divided into several lots, each one the subject of a contract, the cumulative value of all the lots must be taken into account in determining whether the ECU 200,000 threshold has been reached. If the threshold is reached, the Services Directive must be applied to each contract, irrespective of the fact that its individual value may be less than ECU 200,000.
A contracting authority need not apply the provisions of the Services Directive to any lots which have an estimated individual value net of VAT of less than ECU 80,000, provided that the total value of such lots does not exceed 20% of the total value of all the lots. Exclusion of lots in this way does not prevent their value from being taken into account to determine whether the other lots must be awarded in accordance with the Services Directive.
Example:
A services contract for maintenance of buildings is divided into the following lots:
Lot 1 ECU 100,000
Lot 2 ECU 60,000
Lot 3 ECU 45,000
Lot 4 ECU 45,000
Total ECU 240,000
The cumulative value is ECU 240,000 so the value threshold for application of the Services Directive has clearly been reached. Each of the lots 2, 3 and 4 is less than ECU 80,000 but the derogation is permitted only up to 20% of the cumulative value, namely ECU 48,000. The contracting authority therefore has the option of excluding Lot 3 or Lot 4, but not both, from application of the Services Directive. The three lots not excluded must be awarded in accordance with the Directive because their total value including the excluded lot, is not less than ECU 200,000.
2.2.4 Intended repetition of similar services
It should be remembered that when a contracting authority intends to have recourse to the negotiated procedure without publication of a notice for the purposes of procuring new services as a repetition of similar services (see 3.3.2.6), it must aggregate the value of the original services and the intended subsequent services in determining whether the threshold has been achieved.
Ralf Grahn
Thursday, 1 January 2009
EU procurement: Subsidised contracts
The EC (EU) Procurement Directive 2004/18/EC covers the award of building contracts concerning hospitals, facilities intended for sports, recreation and leisure, school and university buildings and buildings used for administrative purposes, even if the awarding entity is private, if the contract is subsidised by more than 50 per cent by contracting authorities (public bodies) and the value of the contract is equal to or greater than EUR 5 150 000.
Related service contracts of at least EUR 206 000 fall within the scope of the Procurement Directive.
***
Article 8
Article 8 of the Procurement Directive (Classic Directive) sets out the scope in more detail:
Article 8
Contracts subsidised by more than 50 % by contracting authorities
This Directive shall apply to the awarding of:
(a) contracts which are subsidised directly by contracting authorities by more than 50 % and the estimated value of which, net of VAT, is equal to or greater than EUR 5 150 000,
— where those contracts involve civil engineering activities within the meaning of Annex I,
— where those contracts involve building work for hospitals, facilities intended for sports, recreation and leisure, school and university buildings and buildings used for administrative purposes;
(b) service contracts which are subsidised directly by contracting authorities by more than 50 % and the estimated value of which, net of VAT, is equal to or greater than EUR 206 000 and which are connected with a works contract within the meaning of point (a).
Member States shall take the necessary measures to ensure that the contracting authorities awarding such subsidies ensure compliance with this Directive where that contract is awarded by one or more entities other than themselves or comply with this Directive where they themselves award that contract for and on behalf of those other entities.
***
Subsidy level
The Procurement Directive applies if a number of cumulative conditions are met. The contract awarded by a private entity is subsidised by more than 50 per cent by one or more contracting authorities (public bodies).
***
Thresholds
The estimated value of the contract, net of VAT, is equal to or greater than EUR 5 150 000.
The estimated value of the related service contract, net of VAT, is equal to or greater than EUR 206 000.
The sums were amended from the beginning of 2008 by Commission Regulation (EC) No 1422/2007. For EU member states outside the eurozone, the corresponding amounts in national currencies are found in the Commission’s information, published in OJEU 13.12.2007 C 301/, taking into account the corrigendum published OJEU 20.12.2007 C 310/37.
***
Civil engineering activities
The contract involves civil engineering (building) activities within the meaning of Annex I.
New Annex I
In the consolidated version (of 15 September 2008) of the Procurement directive 2004/18/EC, Annex I stands as amended by Commission Regulation (EC) No 213/2008 (OJEU 15.3.2008 L 74/1), which replaced the old Annex I with a new one. The Regulation applies from 15 September 2008.
***
Type of building (intended purpose)
In addition, the contract involves building work for one of the following: hospitals, facilities intended for sports, recreation and leisure, school and university buildings and buildings used for administrative purposes.
***
Related service contracts
Article 8 point (b) covers related service contracts, which are subsidised directly by contracting authorities by more than 50 % and the estimated value of which, net of VAT, is equal to or greater than EUR 206 000 and which are connected with a works contract within the meaning of point (a).
***
Compliance
The second paragraph of Article 8 entails an obligation for the Member States to take the necessary measures to ensure that the contracting authorities awarding such subsidies ensure compliance with this Directive where that contract is awarded by one or more entities other than themselves or comply with this Directive where they themselves award that contract for and on behalf of those other entities.
***
Commission guidance
The Commission’s Guide to the Community rules on public works contracts (based on the old Directive 93/37/EEC) offers the following explanations (page 12 to 13):
1.5 Contracts subsidized to more than 50% by contracting authorities
The Directive requires Member States to take the necessary measures to ensure that contracting authorities comply or ensure compliance with its provisions where they subsidize directly by more than 50% a works contract awarded by an entity other than themselves, whether that entity is public or private.
This requirement applies, however, only to contracts concerning civil engineering works (covered by Class 50, Group 502, of the NACE nomenclature) and to contracts relating to building work for hospitals, facilities intended for sports, recreation and leisure, school and university buildings and buildings used for administrative purposes.
The subsidies to be taken into consideration are all the different forms of assistance, including that provided by the Community, which are directly intended for the works contracts in question.
In view of the subsidy it is granting and its experience in awarding contracts, a contracting authority could itself choose the contractor, even if the outcome of the works is not intended for its own use. In such cases, it must itself comply with the provisions of the Directive.
If, on the other hand, the choice of contractor is left to the recipient of the subsidy, the contracting authority must require the recipient to comply with the Directive, for example by including such compliance among the general conditions to be met in order to obtain certain grants or among the specific conditions laid down in the instrument granting the subsidy.
The list of the types of works concerned given in the relevant article of the Directive is exhaustive. However, the list of premises, namely hospitals, facilities intended for sports, recreation and leisure, school and university buildings and buildings used for administrative purposes, is a generic list of categories of premises. These categories should not be construed narrowly, since a restrictive interpretation would undermine the aim of the Directive, which is to ensure greater transparency in the award of public works contracts.
Homes for retired people or the physically disabled should thus, for example, be treated in the same way as hospitals where their purpose is to provide medical or surgical care for sick people, whether elderly or disabled, rather than assisting the elderly or disabled and only occasionally administering minor treatment.
Ralf Grahn
Related service contracts of at least EUR 206 000 fall within the scope of the Procurement Directive.
***
Article 8
Article 8 of the Procurement Directive (Classic Directive) sets out the scope in more detail:
Article 8
Contracts subsidised by more than 50 % by contracting authorities
This Directive shall apply to the awarding of:
(a) contracts which are subsidised directly by contracting authorities by more than 50 % and the estimated value of which, net of VAT, is equal to or greater than EUR 5 150 000,
— where those contracts involve civil engineering activities within the meaning of Annex I,
— where those contracts involve building work for hospitals, facilities intended for sports, recreation and leisure, school and university buildings and buildings used for administrative purposes;
(b) service contracts which are subsidised directly by contracting authorities by more than 50 % and the estimated value of which, net of VAT, is equal to or greater than EUR 206 000 and which are connected with a works contract within the meaning of point (a).
Member States shall take the necessary measures to ensure that the contracting authorities awarding such subsidies ensure compliance with this Directive where that contract is awarded by one or more entities other than themselves or comply with this Directive where they themselves award that contract for and on behalf of those other entities.
***
Subsidy level
The Procurement Directive applies if a number of cumulative conditions are met. The contract awarded by a private entity is subsidised by more than 50 per cent by one or more contracting authorities (public bodies).
***
Thresholds
The estimated value of the contract, net of VAT, is equal to or greater than EUR 5 150 000.
The estimated value of the related service contract, net of VAT, is equal to or greater than EUR 206 000.
The sums were amended from the beginning of 2008 by Commission Regulation (EC) No 1422/2007. For EU member states outside the eurozone, the corresponding amounts in national currencies are found in the Commission’s information, published in OJEU 13.12.2007 C 301/, taking into account the corrigendum published OJEU 20.12.2007 C 310/37.
***
Civil engineering activities
The contract involves civil engineering (building) activities within the meaning of Annex I.
New Annex I
In the consolidated version (of 15 September 2008) of the Procurement directive 2004/18/EC, Annex I stands as amended by Commission Regulation (EC) No 213/2008 (OJEU 15.3.2008 L 74/1), which replaced the old Annex I with a new one. The Regulation applies from 15 September 2008.
***
Type of building (intended purpose)
In addition, the contract involves building work for one of the following: hospitals, facilities intended for sports, recreation and leisure, school and university buildings and buildings used for administrative purposes.
***
Related service contracts
Article 8 point (b) covers related service contracts, which are subsidised directly by contracting authorities by more than 50 % and the estimated value of which, net of VAT, is equal to or greater than EUR 206 000 and which are connected with a works contract within the meaning of point (a).
***
Compliance
The second paragraph of Article 8 entails an obligation for the Member States to take the necessary measures to ensure that the contracting authorities awarding such subsidies ensure compliance with this Directive where that contract is awarded by one or more entities other than themselves or comply with this Directive where they themselves award that contract for and on behalf of those other entities.
***
Commission guidance
The Commission’s Guide to the Community rules on public works contracts (based on the old Directive 93/37/EEC) offers the following explanations (page 12 to 13):
1.5 Contracts subsidized to more than 50% by contracting authorities
The Directive requires Member States to take the necessary measures to ensure that contracting authorities comply or ensure compliance with its provisions where they subsidize directly by more than 50% a works contract awarded by an entity other than themselves, whether that entity is public or private.
This requirement applies, however, only to contracts concerning civil engineering works (covered by Class 50, Group 502, of the NACE nomenclature) and to contracts relating to building work for hospitals, facilities intended for sports, recreation and leisure, school and university buildings and buildings used for administrative purposes.
The subsidies to be taken into consideration are all the different forms of assistance, including that provided by the Community, which are directly intended for the works contracts in question.
In view of the subsidy it is granting and its experience in awarding contracts, a contracting authority could itself choose the contractor, even if the outcome of the works is not intended for its own use. In such cases, it must itself comply with the provisions of the Directive.
If, on the other hand, the choice of contractor is left to the recipient of the subsidy, the contracting authority must require the recipient to comply with the Directive, for example by including such compliance among the general conditions to be met in order to obtain certain grants or among the specific conditions laid down in the instrument granting the subsidy.
The list of the types of works concerned given in the relevant article of the Directive is exhaustive. However, the list of premises, namely hospitals, facilities intended for sports, recreation and leisure, school and university buildings and buildings used for administrative purposes, is a generic list of categories of premises. These categories should not be construed narrowly, since a restrictive interpretation would undermine the aim of the Directive, which is to ensure greater transparency in the award of public works contracts.
Homes for retired people or the physically disabled should thus, for example, be treated in the same way as hospitals where their purpose is to provide medical or surgical care for sick people, whether elderly or disabled, rather than assisting the elderly or disabled and only occasionally administering minor treatment.
Ralf Grahn
Wednesday, 31 December 2008
EU procurement: Threshold amounts for public contracts
Even if the EC (EU) treaty principles of free movement, equal treatment and transparency apply to all public procurement in the internal market, the detailed provisions of the Procurement Directive 2004/18/EC apply to contracts with more significance for the single market and relevant to the WTO Government Procurement Agreement (GPA).
The rough and ready answer has been to devise monetary thresholds for different types of public contracts, with the amounts originally defined in special drawing rights (SDR), but “translated” into euros in the Procurement Directive. These contract thresholds have to be adjusted from time to time to the changing values of the SDRs to comply with the GPA.
***
Revision of the thresholds
The thresholds in euros are set out in Article 7 of the Procurement Directive, based on the system for revision in Article 78. The references to Article 77(2) point to the advisory procedure (Advisory Committee for Public Contracts).
The thresholds are verified (and revised) every two years:
Article 78
Revision of the thresholds
1. The Commission shall verify the thresholds established in Article 7 every two years from the entry into force of this Directive and shall, if necessary, revise them in accordance with the procedure laid down in Article 77(2).
The calculation of the value of these thresholds shall be based on the average daily value of the euro, expressed in SDRs, over the 24 months terminating on the last day of August preceding the revision with effect from 1 January. The value of the thresholds thus revised shall, where necessary, be rounded down to the nearest thousand euro so as to ensure that the thresholds in force provided for by the Agreement, expressed in SDRs, are observed.
2. At the same time as the revision under paragraph 1, the Commission, in accordance with the procedure under Article 77(2), shall align:
(a) the thresholds established in (a) of the first subparagraph of Article 8, in Article 56 and in the first subparagraph of Article 63(1) on the revised threshold applying to public works contracts;
(b) the threshold established in Article 67(1)(a) on the revised threshold applying to public service contracts awarded by the contracting authorities referred to in Annex IV;
(c) the thresholds established in (b) of the first subparagraph of Article 8 and in Article 67(1)(b) and (c) on the revised threshold applying to public service contracts awarded by contracting authorities other than those referred to in Annex IV.
3. The value of the thresholds set pursuant to paragraph 1 in the national currencies of the Member States which are not participating in monetary union is normally to be adjusted every two years from 1 January 2004 onwards. The calculation of such value shall be based on the average daily values of those currencies expressed in euro over the 24 months terminating on the last day of August preceding the revision with effect from 1 January.
4. The revised thresholds referred to in paragraph 1 and their corresponding values in the national currencies referred to in paragraph 3 shall be published by the Commission in the Official Journal of the European Union at the beginning of the month of November following their revision.
***
Revised thresholds from 2008
The thresholds were revised by Commission Regulation (EC) No 1422/2007 of 4 December 2007 amending Directives 2004/17/EC and 2004/18/EC of the European Parliament and of the Council in respect of their application thresholds for the procedures for the award of contracts (OJEU 5.12.2007 L 317/34).
The Regulation entered into force on 1 January 2008.
***
Amended Procurement Directive
Based on Commission Regulation 1422/2007, Article 7 of the Procurement Directive 2004/18/EC appears like this in the consolidated version (of 15 September 2008):
CHAPTER II
Scope
S e c t i o n 1
Thresholds
Article 7
Threshold amounts for public contracts
This Directive shall apply to public contracts which are not excluded in accordance with the exceptions provided for in Articles 10 and 11 and Articles 12 to 18 and which have a value exclusive of value-added tax (VAT) estimated to be equal to or greater than the following thresholds:
(a) EUR 133 000 for public supply and service contracts others than those covered by point (b), third indent, awarded by contracting authorities which are listed as central government authorities in Annex IV; in the case of public supply contracts awarded by contracting authorities operating in the field of defence, this shall apply only to contracts involving products covered by Annex V;
(b) EUR 206 000
— for public supply and service contracts awarded by contracting authorities other than those listed in Annex IV,
— for public supply contracts awarded by contracting authorities which are listed in Annex IV and operate in the field of defence, where these contracts involve products not covered by Annex V,
— for public service contracts awarded by any contracting authority in respect of the services listed in Category 8 of Annex IIA, Category 5 telecommunications services the positions of which in the CPV are equivalent to CPC reference Nos 7524, 7525 and 7526 and/or the services listed in Annex II B;
(c) EUR 5 150 000 for public works contracts.
***
Other threshold provisions
The thresholds appear in Article 8(1) on contracts subsidised by more than 50 % by contracting authorities, in Article 56 regarding public works concessions, in Article 63(1) on advertising public works concessions and Article 67(1) on design contests.
In addition, sums of EUR 80 000 and 1 000 000 with regard to lots are mentioned in Article 9(5)(a) and (b).
***
Thresholds in national currencies
The euro thresholds apply directly in the (from tomorrow) 16 eurozone countries, but this still leaves us with the amounts in national currencies of the countries outside the euro area (cf. Article 78(3) above).
The Commission has published the Corresponding values of the thresholds of Directives 2004/17/EC and 2004/18/EC of the European Parliament and of the Council in the Official Journal of the European Union 13.12.2007 C 301/1. The sums were correct, but the reference bewildering.
After the corrigendum published in the OJEU 20.12.2007 C 310/77, the corresponding values in the national currencies other than euro of the thresholds of Directives 2004/17/EC and 2004/18/EC refer to the Directives as last amended by Commission Regulation (EC) No 1422/2007 (OJEU 5.12.2007 L 317/34).
When reading the Procurement Directive, you can easily find the corresponding value in the desired national currency:
EUR 80 000
BGN New Bulgarian Lev 156 464
CZK Czech Koruna 2 274 915
DKK Danish Krone 596 444
EEK Estonian Kroon 1 251 728
GBP Pound Sterling 54 327
HUF Hungarian forint 20 587 272
LTL Lithuanian Litas 276 224
LVL Latvian Lats 55 792
PLN New Polish Zloty 310 171
RON New Romanian Leu 276 865
SEK Swedish Krona 742 196
SKK Slovak Koruna 2 906 438
EUR 133 000
BGN New Bulgarian Lev 260 121
CZK Czech Koruna 3 782 045
DKK Danish Krone 991 589
EEK Estonian Kroon 2 080 998
GBP Pound Sterling 90 319
HUF Hungarian forint 34 226 339
LTL Lithuanian Litas 459 222
LVL Latvian Lats 92 755
PLN New Polish Zloty 515 660
RON New Romanian Leu 460 289
SEK Swedish Krona 1 233 901
SKK Slovak Koruna 4 831 953
EUR 206 000
BGN New Bulgarian Lev 402 894
CZK Czech Koruna 5 857 905
DKK Danish Krone 1 535 844
EEK Estonian Kroon 3 223 200
GBP Pound Sterling 139 893
HUF Hungarian forint 53 012 225
LTL Lithuanian Litas 711 277
LVL Latvian Lats 143 665
PLN New Polish Zloty 798 691
RON New Romanian Leu 712 928
SEK Swedish Krona 1 911 155
SKK Slovak Koruna 7 484 078
EUR 412 000
BGN New Bulgarian Lev 805 789
CZK Czech Koruna 11 715 810
DKK Danish Krone 3 071 689
EEK Estonian Kroon 6 446 399
GBP Pound Sterling 279 785
HUF Hungarian forint 106 024 450
LTL Lithuanian Litas 1 422 554
LVL Latvian Lats 287 331
PLN New Polish Zloty 1 597 381
RON New Romanian Leu 1 425 856
SEK Swedish Krona 3 822 309
SKK Slovak Koruna 14 968 156
EUR 1 000 000
BGN New Bulgarian Lev 1 955 798
CZK Czech Koruna 28 436 432
DKK Danish Krone 7 455 555
EEK Estonian Kroon 15 646 600
GBP Pound Sterling 679 090
HUF Hungarian forint 257 340 898
LTL Lithuanian Litas 3 452 800
LVL Latvian Lats 697 404
PLN New Polish Zloty 3 877 139
RON New Romanian Leu 3 460 816
SEK Swedish Krona 9 277 450
SKK Slovak Koruna 36 330 475
EUR 5 150 000
BGN New Bulgarian Lev 10 072 362
CZK Czech Koruna 146 447 623
DKK Danish Krone 38 396 109
EEK Estonian Kroon 80 579 990
GBP Pound Sterling 3 497 313
HUF Hungarian forint 1 325 305 627
LTL Lithuanian Litas 17 781 920
LVL Latvian Lats 3 591 633
PLN New Polish Zloty 19 967 267
RON New Romanian Leu 17 823 204
SEK Swedish Krona 47 778 869
SKK Slovak Koruna 187 101 944
***
Comments relevant to the subject are appreciated.
Ralf Grahn
The rough and ready answer has been to devise monetary thresholds for different types of public contracts, with the amounts originally defined in special drawing rights (SDR), but “translated” into euros in the Procurement Directive. These contract thresholds have to be adjusted from time to time to the changing values of the SDRs to comply with the GPA.
***
Revision of the thresholds
The thresholds in euros are set out in Article 7 of the Procurement Directive, based on the system for revision in Article 78. The references to Article 77(2) point to the advisory procedure (Advisory Committee for Public Contracts).
The thresholds are verified (and revised) every two years:
Article 78
Revision of the thresholds
1. The Commission shall verify the thresholds established in Article 7 every two years from the entry into force of this Directive and shall, if necessary, revise them in accordance with the procedure laid down in Article 77(2).
The calculation of the value of these thresholds shall be based on the average daily value of the euro, expressed in SDRs, over the 24 months terminating on the last day of August preceding the revision with effect from 1 January. The value of the thresholds thus revised shall, where necessary, be rounded down to the nearest thousand euro so as to ensure that the thresholds in force provided for by the Agreement, expressed in SDRs, are observed.
2. At the same time as the revision under paragraph 1, the Commission, in accordance with the procedure under Article 77(2), shall align:
(a) the thresholds established in (a) of the first subparagraph of Article 8, in Article 56 and in the first subparagraph of Article 63(1) on the revised threshold applying to public works contracts;
(b) the threshold established in Article 67(1)(a) on the revised threshold applying to public service contracts awarded by the contracting authorities referred to in Annex IV;
(c) the thresholds established in (b) of the first subparagraph of Article 8 and in Article 67(1)(b) and (c) on the revised threshold applying to public service contracts awarded by contracting authorities other than those referred to in Annex IV.
3. The value of the thresholds set pursuant to paragraph 1 in the national currencies of the Member States which are not participating in monetary union is normally to be adjusted every two years from 1 January 2004 onwards. The calculation of such value shall be based on the average daily values of those currencies expressed in euro over the 24 months terminating on the last day of August preceding the revision with effect from 1 January.
4. The revised thresholds referred to in paragraph 1 and their corresponding values in the national currencies referred to in paragraph 3 shall be published by the Commission in the Official Journal of the European Union at the beginning of the month of November following their revision.
***
Revised thresholds from 2008
The thresholds were revised by Commission Regulation (EC) No 1422/2007 of 4 December 2007 amending Directives 2004/17/EC and 2004/18/EC of the European Parliament and of the Council in respect of their application thresholds for the procedures for the award of contracts (OJEU 5.12.2007 L 317/34).
The Regulation entered into force on 1 January 2008.
***
Amended Procurement Directive
Based on Commission Regulation 1422/2007, Article 7 of the Procurement Directive 2004/18/EC appears like this in the consolidated version (of 15 September 2008):
CHAPTER II
Scope
S e c t i o n 1
Thresholds
Article 7
Threshold amounts for public contracts
This Directive shall apply to public contracts which are not excluded in accordance with the exceptions provided for in Articles 10 and 11 and Articles 12 to 18 and which have a value exclusive of value-added tax (VAT) estimated to be equal to or greater than the following thresholds:
(a) EUR 133 000 for public supply and service contracts others than those covered by point (b), third indent, awarded by contracting authorities which are listed as central government authorities in Annex IV; in the case of public supply contracts awarded by contracting authorities operating in the field of defence, this shall apply only to contracts involving products covered by Annex V;
(b) EUR 206 000
— for public supply and service contracts awarded by contracting authorities other than those listed in Annex IV,
— for public supply contracts awarded by contracting authorities which are listed in Annex IV and operate in the field of defence, where these contracts involve products not covered by Annex V,
— for public service contracts awarded by any contracting authority in respect of the services listed in Category 8 of Annex IIA, Category 5 telecommunications services the positions of which in the CPV are equivalent to CPC reference Nos 7524, 7525 and 7526 and/or the services listed in Annex II B;
(c) EUR 5 150 000 for public works contracts.
***
Other threshold provisions
The thresholds appear in Article 8(1) on contracts subsidised by more than 50 % by contracting authorities, in Article 56 regarding public works concessions, in Article 63(1) on advertising public works concessions and Article 67(1) on design contests.
In addition, sums of EUR 80 000 and 1 000 000 with regard to lots are mentioned in Article 9(5)(a) and (b).
***
Thresholds in national currencies
The euro thresholds apply directly in the (from tomorrow) 16 eurozone countries, but this still leaves us with the amounts in national currencies of the countries outside the euro area (cf. Article 78(3) above).
The Commission has published the Corresponding values of the thresholds of Directives 2004/17/EC and 2004/18/EC of the European Parliament and of the Council in the Official Journal of the European Union 13.12.2007 C 301/1. The sums were correct, but the reference bewildering.
After the corrigendum published in the OJEU 20.12.2007 C 310/77, the corresponding values in the national currencies other than euro of the thresholds of Directives 2004/17/EC and 2004/18/EC refer to the Directives as last amended by Commission Regulation (EC) No 1422/2007 (OJEU 5.12.2007 L 317/34).
When reading the Procurement Directive, you can easily find the corresponding value in the desired national currency:
EUR 80 000
BGN New Bulgarian Lev 156 464
CZK Czech Koruna 2 274 915
DKK Danish Krone 596 444
EEK Estonian Kroon 1 251 728
GBP Pound Sterling 54 327
HUF Hungarian forint 20 587 272
LTL Lithuanian Litas 276 224
LVL Latvian Lats 55 792
PLN New Polish Zloty 310 171
RON New Romanian Leu 276 865
SEK Swedish Krona 742 196
SKK Slovak Koruna 2 906 438
EUR 133 000
BGN New Bulgarian Lev 260 121
CZK Czech Koruna 3 782 045
DKK Danish Krone 991 589
EEK Estonian Kroon 2 080 998
GBP Pound Sterling 90 319
HUF Hungarian forint 34 226 339
LTL Lithuanian Litas 459 222
LVL Latvian Lats 92 755
PLN New Polish Zloty 515 660
RON New Romanian Leu 460 289
SEK Swedish Krona 1 233 901
SKK Slovak Koruna 4 831 953
EUR 206 000
BGN New Bulgarian Lev 402 894
CZK Czech Koruna 5 857 905
DKK Danish Krone 1 535 844
EEK Estonian Kroon 3 223 200
GBP Pound Sterling 139 893
HUF Hungarian forint 53 012 225
LTL Lithuanian Litas 711 277
LVL Latvian Lats 143 665
PLN New Polish Zloty 798 691
RON New Romanian Leu 712 928
SEK Swedish Krona 1 911 155
SKK Slovak Koruna 7 484 078
EUR 412 000
BGN New Bulgarian Lev 805 789
CZK Czech Koruna 11 715 810
DKK Danish Krone 3 071 689
EEK Estonian Kroon 6 446 399
GBP Pound Sterling 279 785
HUF Hungarian forint 106 024 450
LTL Lithuanian Litas 1 422 554
LVL Latvian Lats 287 331
PLN New Polish Zloty 1 597 381
RON New Romanian Leu 1 425 856
SEK Swedish Krona 3 822 309
SKK Slovak Koruna 14 968 156
EUR 1 000 000
BGN New Bulgarian Lev 1 955 798
CZK Czech Koruna 28 436 432
DKK Danish Krone 7 455 555
EEK Estonian Kroon 15 646 600
GBP Pound Sterling 679 090
HUF Hungarian forint 257 340 898
LTL Lithuanian Litas 3 452 800
LVL Latvian Lats 697 404
PLN New Polish Zloty 3 877 139
RON New Romanian Leu 3 460 816
SEK Swedish Krona 9 277 450
SKK Slovak Koruna 36 330 475
EUR 5 150 000
BGN New Bulgarian Lev 10 072 362
CZK Czech Koruna 146 447 623
DKK Danish Krone 38 396 109
EEK Estonian Kroon 80 579 990
GBP Pound Sterling 3 497 313
HUF Hungarian forint 1 325 305 627
LTL Lithuanian Litas 17 781 920
LVL Latvian Lats 3 591 633
PLN New Polish Zloty 19 967 267
RON New Romanian Leu 17 823 204
SEK Swedish Krona 47 778 869
SKK Slovak Koruna 187 101 944
***
Comments relevant to the subject are appreciated.
Ralf Grahn
Wednesday, 23 April 2008
EU TFEU: National parliaments in criminal matters and police cooperation
In EU criminal matters and police cooperation the national parliaments are given a lower than usual threshold to force a rethink of a legislative proposal on the grounds of subsidiarity, the principle meaning that decisions should be taken as closely as possible to the citizens of the European Union.
The EU Treaty of Lisbon moves criminal matters and police cooperation from the ntergovernmental third pillar to become more or less normal internal policy areas.
***
Article 68 of the Treaty on the Functioning of the European Union (TFEU) is presented as it stands after the intergovernmental conference (IGC 2007) in the Treaty of Lisbon (ToL), renumbered and provisionally consolidated by the Council of the European Union (document 6655/08; page 96), with the location of the provision added from the table of equivalences (page 460 to 462):
Part Three ‘Policies and internal actions of the Union’
Title V TFEU ‘Area of freedom, security and justice’
Chapter 1 ‘General provisions’
Article 69 TFEU
National Parliaments ensure that the proposals and legislative initiatives submitted under Chapters 4 and 5 comply with the principle of subsidiarity, in accordance with the arrangements laid down by the Protocol on the application of the principles of subsidiarity and proportionality.
***
In Article 2, point 64, of the Treaty of Lisbon the intergovernmental conference was content to present the wording of the new Article 61b, which became Article 69 TFEU after renumbering (OJ 17.12.2007 C 306/57).
***
There is no directly corresponding Article in the present treaties.
***
The European Convention proposed the following Article III-160 of the draft Treaty establishing a Constitution for Europe (OJ 18.7.2003 C 169/57):
Article III-160 Draft Constitution
1. Member States' national Parliaments shall ensure that the proposals and legislative initiatives submitted under Sections 4 and 5 of this Chapter comply with the principle of subsidiarity, in accordance with the arrangements in the Protocol on the application of the principles of subsidiarity and proportionality.
Member States' national Parliaments may participate in the evaluation mechanisms contained in Article III-161 and in the political monitoring of Europol and the evaluation of Eurojust's activities in accordance with Articles III-177 and III-174.
***
The IGC 2004 split the first paragraph of the draft into an Article III-259 with small stylistic changes (OJ 16.12.2004 C 310/113):
Article III-259 Constitution
National Parliaments shall ensure that the proposals and legislative initiatives submitted under Sections 4 and 5 of this Chapter comply with the principle of subsidiarity, in accordance with the arrangements laid down by the Protocol on the application of the principles of subsidiarity and proportionality.
***
We can see that the meat was served by the European Convention, tranched by the IGC 2004 and seasoned by the IGC 2007 to accommodate a sensitive British palate by removing the abhorrent ‘shall’. In addition a few necessary technical adjustments were made.
***
Actually, a provision like this is more like a food coupon than a real meal, because it only holds out the promise of something substantial through referrals to other provisions.
First, we are sent off to check out the substance of the offering by looking up the subject matter covered. As pointed out in Article 2, point 63, of the Treaty of Lisbon, Chapter 4 is called ‘Judicial cooperation in criminal matters’ and Chapter 5 concerns ‘Police cooperation’.
At this point we can conclude that some sort of special arrangement is reserved for the two areas shifted from the intergovernmental third pillar (TEU) to what is presently known as the first or Community pillar (TEC).
***
Second, the procedures are laid down in the Protocol on the application of the principles of subsidiarity and proportionality.
Protocol (No 2) on the application of the principles of subsidiarity and proportionality has been honed at every turn, but we are content to look at its coming incarnation, as envisioned by the Treaty of Lisbon in the provisional consolidated version published by the Council (document 6655/08; page 266 to 269).
The difference between the subsidiarity control of draft legislative acts in general and those pertaining to criminal matters or police cooperation appears from Article 7(2) of the Protocol (page 268):
“2. Where reasoned opinions on a draft legislative act's non-compliance with the principle of subsidiarity represent at least one third of all the votes allocated to the national Parliaments in accordance with the second subparagraph of paragraph 1, the draft must be reviewed. This threshold shall be a quarter in the case of a draft legislative act submitted on the basis of Article 76 of the Treaty on the Functioning of the European Union on the area of freedom, security and justice.
After such review, the Commission or, where appropriate, the group of Member States, the European Parliament, the Court of Justice, the European Central Bank or the European Investment Bank, if the draft legislative act originates from them, may decide to maintain, amend or withdraw the draft. Reasons must be given for this decision.”
***
Ordinarily, the threshold for rethinking a legislative proposal is one third of the votes given to the national parliaments, but in the case of draft legislative acts submitted on the basis of Article 76 TFEU, namely acts referred to in Chapters 4 (criminal matters) and 5 (police cooperation) and proposed by the Commission or on the initiative of a quarter of the member states, it is only a quarter of the votes allocated.
The special subsidiarity control threshold for proposals concerning Chapter 4 ‘Judicial cooperation in criminal matters’ and Chapter 5 ‘Police cooperation’ serves as a reminder of their third pillar origins.
Ralf Grahn
EU Treaty sources:
If you want to read or download the Council’s consolidated Treaty on European Union (TEU) and the Treaty on the Functioning of the European Union (TFEU) as amended by the Lisbon Treaty, the original Treaty of Lisbon, the current TEU and TEC, the Draft Constitution, the Constitutional Treaty, or other consolidated language versions of the Lisbon Treaty TEU and TFEU, you find the needed information and links in the blawg post ‘Consolidated Treaty of Lisbon and other EU materials’ of 21 April 2008:
http://grahnlaw.blogspot.com/2008/04/consolidated-treaty-of-lisbon-and-other.html
The EU Treaty of Lisbon moves criminal matters and police cooperation from the ntergovernmental third pillar to become more or less normal internal policy areas.
***
Article 68 of the Treaty on the Functioning of the European Union (TFEU) is presented as it stands after the intergovernmental conference (IGC 2007) in the Treaty of Lisbon (ToL), renumbered and provisionally consolidated by the Council of the European Union (document 6655/08; page 96), with the location of the provision added from the table of equivalences (page 460 to 462):
Part Three ‘Policies and internal actions of the Union’
Title V TFEU ‘Area of freedom, security and justice’
Chapter 1 ‘General provisions’
Article 69 TFEU
National Parliaments ensure that the proposals and legislative initiatives submitted under Chapters 4 and 5 comply with the principle of subsidiarity, in accordance with the arrangements laid down by the Protocol on the application of the principles of subsidiarity and proportionality.
***
In Article 2, point 64, of the Treaty of Lisbon the intergovernmental conference was content to present the wording of the new Article 61b, which became Article 69 TFEU after renumbering (OJ 17.12.2007 C 306/57).
***
There is no directly corresponding Article in the present treaties.
***
The European Convention proposed the following Article III-160 of the draft Treaty establishing a Constitution for Europe (OJ 18.7.2003 C 169/57):
Article III-160 Draft Constitution
1. Member States' national Parliaments shall ensure that the proposals and legislative initiatives submitted under Sections 4 and 5 of this Chapter comply with the principle of subsidiarity, in accordance with the arrangements in the Protocol on the application of the principles of subsidiarity and proportionality.
Member States' national Parliaments may participate in the evaluation mechanisms contained in Article III-161 and in the political monitoring of Europol and the evaluation of Eurojust's activities in accordance with Articles III-177 and III-174.
***
The IGC 2004 split the first paragraph of the draft into an Article III-259 with small stylistic changes (OJ 16.12.2004 C 310/113):
Article III-259 Constitution
National Parliaments shall ensure that the proposals and legislative initiatives submitted under Sections 4 and 5 of this Chapter comply with the principle of subsidiarity, in accordance with the arrangements laid down by the Protocol on the application of the principles of subsidiarity and proportionality.
***
We can see that the meat was served by the European Convention, tranched by the IGC 2004 and seasoned by the IGC 2007 to accommodate a sensitive British palate by removing the abhorrent ‘shall’. In addition a few necessary technical adjustments were made.
***
Actually, a provision like this is more like a food coupon than a real meal, because it only holds out the promise of something substantial through referrals to other provisions.
First, we are sent off to check out the substance of the offering by looking up the subject matter covered. As pointed out in Article 2, point 63, of the Treaty of Lisbon, Chapter 4 is called ‘Judicial cooperation in criminal matters’ and Chapter 5 concerns ‘Police cooperation’.
At this point we can conclude that some sort of special arrangement is reserved for the two areas shifted from the intergovernmental third pillar (TEU) to what is presently known as the first or Community pillar (TEC).
***
Second, the procedures are laid down in the Protocol on the application of the principles of subsidiarity and proportionality.
Protocol (No 2) on the application of the principles of subsidiarity and proportionality has been honed at every turn, but we are content to look at its coming incarnation, as envisioned by the Treaty of Lisbon in the provisional consolidated version published by the Council (document 6655/08; page 266 to 269).
The difference between the subsidiarity control of draft legislative acts in general and those pertaining to criminal matters or police cooperation appears from Article 7(2) of the Protocol (page 268):
“2. Where reasoned opinions on a draft legislative act's non-compliance with the principle of subsidiarity represent at least one third of all the votes allocated to the national Parliaments in accordance with the second subparagraph of paragraph 1, the draft must be reviewed. This threshold shall be a quarter in the case of a draft legislative act submitted on the basis of Article 76 of the Treaty on the Functioning of the European Union on the area of freedom, security and justice.
After such review, the Commission or, where appropriate, the group of Member States, the European Parliament, the Court of Justice, the European Central Bank or the European Investment Bank, if the draft legislative act originates from them, may decide to maintain, amend or withdraw the draft. Reasons must be given for this decision.”
***
Ordinarily, the threshold for rethinking a legislative proposal is one third of the votes given to the national parliaments, but in the case of draft legislative acts submitted on the basis of Article 76 TFEU, namely acts referred to in Chapters 4 (criminal matters) and 5 (police cooperation) and proposed by the Commission or on the initiative of a quarter of the member states, it is only a quarter of the votes allocated.
The special subsidiarity control threshold for proposals concerning Chapter 4 ‘Judicial cooperation in criminal matters’ and Chapter 5 ‘Police cooperation’ serves as a reminder of their third pillar origins.
Ralf Grahn
EU Treaty sources:
If you want to read or download the Council’s consolidated Treaty on European Union (TEU) and the Treaty on the Functioning of the European Union (TFEU) as amended by the Lisbon Treaty, the original Treaty of Lisbon, the current TEU and TEC, the Draft Constitution, the Constitutional Treaty, or other consolidated language versions of the Lisbon Treaty TEU and TFEU, you find the needed information and links in the blawg post ‘Consolidated Treaty of Lisbon and other EU materials’ of 21 April 2008:
http://grahnlaw.blogspot.com/2008/04/consolidated-treaty-of-lisbon-and-other.html
Subscribe to:
Posts (Atom)